Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch by Vesgantti

Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch

$496.64
Sale price  $496.64 Regular price 
Skip to product information
Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch by Vesgantti

Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch

$496.64
Sale price  $496.64 Regular price 

Product Overview

Buyers focused on dining areas appreciate the Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, Flexible Layout Sofa with Ottoman, Boneless Style, No Assembly Required, Grey for its durable quality and long-term durability. measuring 79.6"D x 119.3"W x 32.3"H, weighing 1200 Pounds, available in 119" - 3 Seater & Ottoman Grey. Notable features include modular sectional and sectional flexible, contributing to its modern character.

Key Features

  • Modular Sectional, Flexible Layout: This modular sectional sofa offers ultimate flexibility for any space. Easily convert it into an L shaped couch, modular couch, sectional couch, or convertible sofa bed. Ideal living room furniture for apartments, bedrooms, and small space sofa setups
  • Oversized Deep Seat Comfort: Experience true cloud couch comfort with this oversized sectional sofa. The deep seat couch design is perfect for lounging, stretching, or relaxing. A cozy living room couch and family sofa for everyday comfort
  • Supportive Spring & Foam Design: Built with sinuous springs and high density foam cushions, this sectional couch provides strong support and comfort. A durable living room sofa, supportive couch, and long lasting sectional sofa that resists sagging
  • Soft & Durable Corduroy Fabric: This corduroy couch features soft textured fabric that is breathable, skin-friendly, and wear-resistant. A great pet friendly couch and durable sofa for homes with kids and pets, combining comfort with modern style
  • Convertible with Movable Ottoman: Includes a movable ottoman to easily create a chaise lounge, L shaped sectional, or sofa bed setup. This convertible couch adapts to your space and works as a multifunctional sofa for relaxing, entertaining, or sleeping
  • No Assembly, Easy Setup: This no assembly couch ships in 4 boxes for easy delivery. No tools required—just unpack and expand. Perfect easy setup couch, modular sectional sofa, and living room furniture upgrade

Why Choose the Vesgantti 119" L-Shaped Modular Sectional Sofa

The Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, Flexible Layout Sofa with Ottoman, Boneless Style, No Assembly Required, Grey is positioned for buyers who value durable construction and lasting comfort, supported by modular sectional.

Best For

The Vesgantti 119" L-Shaped Modular Sectional Sofa is best suited for: lounging.

Quick Summary

The Vesgantti 119" L-Shaped Modular Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Seat Depth: 21.7 inches. Seat Height: 17.3 Inches. Weight Limit: 1200 Pounds. Price: $709.48.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required No
Seat Depth 21.7 inches
Seat Height 17.3 Inches
Weight Limit 1200 Pounds
Seating Capacity 4.0
Product Dimensions 79.6"D x 119.3"W x 32.3"H
Item Weight 46 Pounds
Type Sectional
Color 119" - 3 Seater & Ottoman Grey

You may also like