Vesgantti 38.5" Accent Chair by Vesgantti

Vesgantti 38.5" Accent Chair

$317.63
Sale price  $317.63 Regular price 
Skip to product information
Vesgantti 38.5" Accent Chair by Vesgantti

Vesgantti 38.5" Accent Chair

$317.63
Sale price  $317.63 Regular price 

Product Overview

From the materials to the finish, the Vesgantti 38.5" Accent Chair with Movable Ottoman, Comfy Corduroy Armchair with Spring Cushion, Reading Chair with Ottoman, Modern Single Sofa for Living Room, Bedroom and Apartment, Beige reflects versatile choices that support home aesthetics in studio apartments. measuring 31.5"D x 38.5"W x 35"H, weighing 87.3 Pounds, available in 38.5" - 1 Seater & Ottoman Beige. Notable features include accent chair and versatile single-seater, contributing to its comfortable character.

Key Features

  • Accent Chair with Ottoman - This versatile single-seater sofa suits living rooms, bedrooms, or studies, with a sleek design that fits modern and traditional decor. Paired with a movable ottoman, it offers extra comfort for leg support—perfect for reading, watching TV, or unwinding, letting you stretch out and relax
  • Ergonomic & Comfortable - The spring cushions of this reading chair with ottoman absorb the impact of daily use, preventing rapid wear and tear and extending the life of the footstool. With a 20.9-inch seat depth, its generously sized seat offers ample support for both sitting and propping up feet, enhancing relaxation with exceptional pressure relief that makes every moment feel effortlessly luxurious
  • FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This accent chair is known for its sturdiness and solidity, with a maximum weight capacity of 440lbs. Additionally, the single sofa chair features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
  • Durable Corduroy Fabric - This corduroy sofa chair features distinct parallel ridges for a smooth, plush feel. Its velvety surface and modern design exude luxury, while the thick, wear-resistant build ensures lasting comfort. Available in four colors—note slight hue variations due to monitors and lighting
  • Shipped in 2 Separate Packages - kindly allow for their arrival at different times. Easy 30-min assembly without additional tools. Cushions take 24-48 hours to fully recover due to compressed packaging. You can pat the cushion to make it fluffy and feel better. Contact us with questions

Why Choose the Vesgantti 38.5" Accent Chair with Movable Ottoman

The Vesgantti 38.5" Accent Chair with Movable Ottoman, Comfy Corduroy Armchair with Spring Cushion, Reading Chair with Ottoman, Modern Single Sofa for Living Room, Bedroom and Apartment, Beige demonstrates that minimalist engineering and accent chair can coexist — the result is modern style that justifies the choice.

Best For

The Vesgantti 38.5" Accent Chair with Movable Ottoman is best suited for: Back Support, Ergonomic, Removable Ottoman, Space Saving, Upholstered, reading.

Quick Summary

The Vesgantti 38.5" Accent Chair with Movable Ottoman is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 20.9 inches. Seat Height: 7 Inches. Product Dimensions: 31.5"D x 38.5"W x 35"H. Price: $453.75.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Seat Depth 20.9 inches
Seat Height 7 Inches
Product Dimensions 31.5"D x 38.5"W x 35"H
Item Weight 87.3 Pounds
Color 38.5" - 1 Seater & Ottoman Beige
Style Modern
Special Feature Back Support, Ergonomic, Removable Ottoman, Space Saving, Upholstered
Room Type Bedroom, Dressing Room, Home Theater, Living Room, Office

You may also like