Vesgantti Large Modular Sectional Sofa, Big Comfy Cloud Couch by Vesgantti

Vesgantti Large Modular Sectional Sofa, Big Comfy Cloud Couch

$1,616.99
Sale price  $1,616.99 Regular price 
Skip to product information
Vesgantti Large Modular Sectional Sofa, Big Comfy Cloud Couch by Vesgantti

Vesgantti Large Modular Sectional Sofa, Big Comfy Cloud Couch

$1,616.99
Sale price  $1,616.99 Regular price 

Product Overview

A adjustable take on kids rooms, the Vesgantti Large Modular Sectional Sofa, Big Comfy Cloud Couch with Ottoman Deep Seat Chenille Cloud Sofa, 8 Seater Large Sectional Couches for Living Room, Bedroom and Apartment, Gray delivers modern style where it matters. measuring 101"D x 135"W x 35.5"H, weighing 2000 Pounds, available in Chenille - Gray. Notable features include cloud couch and couch delivers, contributing to its space-saving character.

Key Features

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 26-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Seven adjustable back cushions and two detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
  • Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 135"W x 101"D x 35.5"H and seating for 5+ people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
  • Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this 5 seater sectional couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
  • Two Sets of Sofa Legs & Effortless Assembly: This oversized couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
  • Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This big comfy couch will be delivered in 5 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team

Why Choose the Vesgantti Large Modular Sectional Sofa

The Vesgantti Large Modular Sectional Sofa, Big Comfy Cloud Couch with Ottoman Deep Seat Chenille Cloud Sofa, 8 Seater Large Sectional Couches for Living Room, Bedroom and Apartment, Gray earns its place through stylish quality and thoughtful features including cloud couch. The result is space optimization that lasts.

Best For

The Vesgantti Large Modular Sectional Sofa is best suited for: Cloud Sectional, Extra-deep Ottoman, Pillow Top Armrest, Removable Cover, Two Sets of Legs, stretching out or curling up, all body types.

Quick Summary

The Vesgantti Large Modular Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Weight Limit: 2000 Pounds. Seating Capacity: 8. Product Dimensions: 101"D x 135"W x 35.5"H. Price: $2309.98.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Weight Limit 2000 Pounds
Seating Capacity 8
Product Dimensions 101"D x 135"W x 35.5"H
Item Weight 35 Kilograms
Type Sectional
Color Chenille - Gray
Style Modern
Special Feature Cloud Sectional, Extra-deep Ottoman, Pillow Top Armrest, Removable Cover, Two Sets of Legs

You may also like